Smartek-systems SAS-1 Relay Interface Configuration And Connection Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Czujniki Smartek-systems SAS-1 Relay Interface Configuration And Connection. SmarTek Systems SAS-1 Relay Interface Configuration And Connection User Manual [es] [it] [de] [en] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 8
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
S
S
S
S
SmarTek Systems, Inc.
SmarTek Systems, Inc.
14710 Kogan Drive
Woodbridge, VA 22193
703-680-6554
Sales 410-315-9727
TM
TM
Sensing and System Integration Solutions
SmarTek Acoustic Sensor - Version 1
(SAS-1)
Installation and Setup Guide
Part-H
SAS Relay Interface Configuration And Connection
04 April 2003
Note:
In all cases, do not work or position equipment over an active traffic lane. Working
over active lanes presents a hazard to the installer and to travelers using the highway.
Follow local authorized procedures when installing the SAS-1 unit and any associated
components or subsystems.
Przeglądanie stron 0
1 2 3 4 5 6 7 8

Podsumowanie treści

Strona 1 - SmarTek Systems, Inc

SSSSSmarTek Systems, Inc.SmarTek Systems, Inc.14710 Kogan DriveWoodbridge, VA 22193 703-680-6554 Sales 410-315-9727TMTMSensing and System Integration

Strona 2

SmarTek Systems (www.smarteksys.com)2(This Page Intentionally Left Blank)

Strona 3 - Pwr - 8 to 24 VDC

SmarTek Systems (www.smarteksys.com)3SAS Relay Interface Configuration and ConnectionMany traffic monitoring sites in place (orplanned) and traffic co

Strona 4 - Main D 1 D 2

SmarTek Systems (www.smarteksys.com)4Connecting and Routing Relay Signals For The SAS-RI Type 170 CardThe type 170 card version is comprised of aSAS-R

Strona 5

SmarTek Systems (www.smarteksys.com)5a card edge contact (F, W, S, Y). From Figure 4 it can be seen that the SAS-RI Main card routesrelay signals 1A,

Strona 6

SmarTek Systems (www.smarteksys.com)6should light based on detections by the SAS-1. To setup SAS-1 or to repeat the SAS-1 setupusing the SAS Monitor

Strona 7 - SAS Cabinet Termination

SmarTek Systems (www.smarteksys.com)7on the second SAS-RI to the RJA jack on the third SAS-RI. This pattern continues for up to 6SAS-RI cards.Note: E

Strona 8

SmarTek Systems (www.smarteksys.com)8Note: Each SAS-RI used as slaves (SAS0002 thru SAS0006) in Figure 7 must be factorymodified for receive only capa

Komentarze do niniejszej Instrukcji

Brak uwag